Milton Building News · Permit Applications
Milton Demolition Filings Have Stayed High Since 2024
Townwide · Trend · Nov 19, 2026
Milton had 55 demolition permit applications in 2024 and 45 in 2025, up from 22 to 38 a year before, and whole-building teardowns peaked at 15 in 2024.
- Whole buildings: Filings to tear down a whole house or building ran 4 to 13 a year in 2016 to 2023, then 15 in 2024 and 12 in 2025. The closest were 2021 and 2022, at 11 and 13.
- Smaller jobs: Partial, interior and smaller jobs, such as porches, garages and pools, went from 18 to 31 a year to 40 in 2024 and 33 in 2025.
- This year: January through October, all demolition filings were about even: 41, the same as in those months of 2025. Whole-building filings were 5, down from 10.
- Applications, not projects: These are applications filed, not finished projects. One project can need more than one permit.
- How we counted: Milton permit applications mentioning demolition, once each, by year filed. Whole building means the description says a house or building comes down; garages and sheds count as smaller jobs. Vague descriptions make whole-building counts approximate. Source: the town's PermitEyes records.
Sources: Milton permit records (PermitEyes)